Back to Top

Pacific Pines Residential Development

Description of Works –

  • Approximately 1500 residential lot site which consisted of 200Ha of dense clearing
  • 5 million m3 earthworks with approximately 50% being rock requiring blasting and ripping
  • Over 20km of rigid and flexible pavements
  • Four signalised intersections
  • Two signalised school zones
  • tie inns to the Pacific Motorway
  • 18,000m of water reticulation
  • 18,000m of gravity and rising main sewer including three pump stations
  • 9000m of stormwater including major RCBC through natural water courses
  • Electrical reticulation and street lighting
  • Nine bio-retention facilities
  • 3 Bebo Arches

Special Features –

  • Bebo Arches – 1 x twin arch and 2 x single arch 20m long with light shaft midway
  • Span is 11.5m each arch with precast headwalls
  • Natural water course deviations
  • Weir Structures
  • Divided Roads
  • Signalised Intersections
  • Bio filtration basin
  • Extensive retaining structures

Gallery

Quick Facts

  • Location - Pacific Pines QLD
  • Start Date - 1996
  • Completion Date - 2011
  • Value - $220 Million
  • Client - Stockland Developments
  • Consultant - VKL Consulting

Location