Hayman Island Villas

Description of Works

Project Works involve the construction of 2km of roadways in steep, rocky terrain and residential lots in accordance with strict environmental standards.  All concrete was manufactured on site by SEE Civil using our own Concrete batching plant. Works included the following:

  • Piered Concrete Roadways 2km
  • Retaining Walls
  • Bored Piers 900mm diameter up to 8m deep
  • Rock Anchors 6m long
  • Associated Services
  • Traffic Control
  • Erosion, sediment control and monitoring
  • Logistically challenging island works

This project is required to meet SEE Integrated Management System and ISO 9001, ISO 14001 and AS/NZS 4802

Special Features

  • All materials are transported through an existing tourist resort by trucks under strict resort road rules.
  • All materials imported to island by Barge
  • Road founded on piers
  • Cast Insitu retaining walls

Gallery

Quick Facts

  • Location - Hayman Island
  • Start Date - February 2008
  • Completion Date - December 2010
  • Value - $11 Million
  • Client - Mulpha Developments Pty Ltd
  • Consultant - Cardno MBK QLD Pty Ltd